10% Off Sitewide – CÓDIGO: AUG5 ENDS SOON: --d --h --m --s -d --h restante
5% Off Sitewide — Code: aug5
AUG5
MAXBLAST  |  SKU: 26480

MAXBLAST Powered Chimney Sweep 12m

£59.99
Includes VAT and Free UK Shipping
Powered by

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Lowest Price Guarantee

We regularly review prices to offer you the best value. If you find an identical product supplied by MonsterShop being sold cheaper elsewhere, we'll match that price subject to verification and eligibility. Simply contact us with details of the lower price and we'll take care of the rest. Terms and conditions apply.

Monster Guarantee

As part of our Customer Satisfaction Policy, we proudly offer a 30-day return period for any reason, whether it be a change of mind or any other circumstance. Customers within the UK are responsible for initiating the return process themselves.

Delivery and Shipping

Our Free Shipping policy means orders placed before 2pm get FREE next day delivery.

Description

Chimney sweep got the ‘flue’? Need a tool ‘soot-able’ to get the job done yourself?
Well we have the perfect solution for you, with the power Chimney Sweeping Brush from MAXBLAST.

The flexible, reinforced nylon rods make light work of tight bends and 45-degree angles. Whether your chimney is mortar, or lined, we have got you covered with the hard wearing, nylon bristles of the sweeper head. Each bunch has 7 bristles - the more bristles, the more cleaning they can do!

Just connect your new brush to your existing drill and you are ready to go! This power sweeper is sure to remove a considerable amount more dust than traditional hand sweeping – just try it and see. To help you keep the job tidy, we have even included a FREE plastic dust sheet.

*Drill not included*

Product Features:

  • Powered Chimney Sweeping Brush from MAXBLAST
  • 7 Bristles per bunch – more than your average
  • FREE storage bag and dust sheet included
  • Includes drill adapter and allen key
  • Easily connects and disconnect from your existing drill (1.5mAh to 2.5mAh)
  • The flexible rods are great for tight bends and 45-degree angles
  • ROHS certified product
  • Suitable for chimneys with a diameter of 20cm - 70cm

Specifications:

  • Overall Length: 12m / 1200cm / 472”
  • Length Per Rod: 1m / 100cm / 39.4”
  • Rod Material: Reinforced Nylon
  • Bristle Material: Nylon
  • Weight: 2.2kg
MAXBLAST Powered Chimney Sweep 12m with flexible rods, orange bristles, and a protective storage box for easy use and transport
MAXBLAST

MAXBLAST Powered Chimney Sweep 12m

£59.99
View product